Prepare for Double Eleven and Escort Suning Logistics

Views:4     Author:Site Editor     Publish Time: 2020-09-28      Origin:Site

Project Name: heavy duty pallet racking system for Suning Logistics Group

 

Suning Logistics Group is one of the eight major industrial groups under Suning Holding Group. It is one of the first domestic companies engaged in warehousing, transportation, and distribution to provide full-process services. As of January 2019, the total area of related supporting warehousing owned by Suning Logistics and Tiantian Express reached 8.7 million square meters, with 1 small shipment origination center, 1 large shipment origination center, and 4s Lenglian logistics warehouses. 6 major cross-border ports and 6 overseas warehouses have been opened, as well as 465 urban distribution centers and 27,700 terminal express delivery points, covering 2,872 districts and counties nationwide. There are more than 100,000 transportation vehicles nationwide, and more than 4,000 trunk and branch lines network, which can achieve 24-hour delivery in more than 95% of the country.

 

5


Survey site


6


As the shelf supplier of Suning Logistics Group, Jiangsu Vinda Logistics Co., Ltd. fully cooperates with Suning Logistics Group's storage shelf supply, installation, and commissioning. This project is a heavy-duty pallet racking system project of the Shanghai Logistics Branch of Suning Logistics Group. The project is to improve storage space, speed up delivery efficiency, and rationally plan a rectification project for the stocking area before Double Eleven. There are a total of 1100 sets of heavy-duty pallet rackings. The customer's notification time is September 26, and the installation and acceptance time is November 1st. Time is tight and the task is heavy. We worked out a detailed production and installation plan upon receiving notification of production. According to the plan, the sales staff conducted a detailed survey on the site. There are a lot of goods on-site, which will directly affect the efficiency of the installation. A reasonable plan must be arranged to ensure that the installation is completed before November 1.

 

7


After the survey, the sales staff put forward the actual situation of a lot of goods and the warehouse is full. At the same time, before Double Eleven, the warehouse will enter more goods, which will be more difficult for our later installation and construction. After rescheduling, our company worked overtime in production, striving to save time in the production process and set aside time for installation. Through the efforts of our colleagues, our company completed the delivery one day ahead of schedule. The sales staff arrived at the site at the same time to arrange various preparations for the construction.

 

10


The warehouse area of this project is 30,000 square meters, the installation rack area is 12,000 square meters, and 1100 sets of high-level heavy-duty racks are divided into 10 areas for installation. Due to the special site conditions, it is impossible for the customer to empty all the goods to us Installation, only by making space, we install space for assembly. After the discussion, we determined a plan to facilitate installation on site. The warehouse area of this project is 30,000 square meters, the installation rack area is 12,000 square meters, and 1100 sets of high-level heavy-duty racks are divided into 10 areas for installation. Due to the special site conditions, it is impossible for the customer to empty all the goods to us. Installation heavy duty pallet racking can only be done by freeing up space. After the discussion, we determined a plan to facilitate installation on site.


9


Every day, we encounter different situations at the installation site. We also strive to overcome the adverse effects of no space installation, low cargo movement efficiency and affect the installation progress. We always make the end of installation on November 1 as our commitment to customers. We Weida people overcame various difficulties and faced them, and finally completed the installation of all shelves before November 1st. Weida contributes our efforts to preparing for Suning Logistics' Double Eleven.


Product Category
NANJING WEIDA LOGISTICS
EQUIPMENT CO., LTD
We have the full line-ups of  racking, shelving and their matched products including  long span shelving, selective pallet rack, drive in rack, mezzanine rack and etc.
 Contact: Bryan  ( Export Director) 
 Mp / Whatsapp / Wechat: +86-13951807639
 Skype: bryanwuhongwei
 Email: weierzhou@wdracking.com

QR-code
Scan on WeChat

QUICK LINKS

INDUSTRY SOLUTIONS

Copyright © 2020 Nanjing Weida Logistics Equipment Co., Ltd. All Rights Reserved